PJC Projects Screen

Overview

Project and Job Costing tracks revenue and revenue-earning activity by project.

You use the Projects screen, available in the PJC Setup folder, to define generic project records for the major revenue-earning activities that your company undertakes (for example, design or pouring foundations). Each separate job, or work phase, that contributes revenue to a contract is a project.

Project records contain settings that let you prescribe how and when to recognize revenues, and the type of billing arrangement for each project. You can add records for typical projects that you will reuse or adapt for a number of contracts, and you can set up special projects that you will use for a particular contract.

You specify a unique code to identify each project record. You use the project codes in the Contract Maintenance screen to assign projects to contract records. Project and Job Costing displays the settings from project records as defaults for new contract projects, saving you time when setting up contracts. (You can change the settings for particular contract projects, as necessary.)

Integration Tab

Use this tab to override contract number segments.

Optional Fields tab

This tab appears only if you use Sage 300 Transaction Analysis and Optional Field Creator.

You use the Optional Fields setup screen to define the optional fields you need to store additional information with project records.

Once you have set up optional fields for projects, you use this tab to enter the optional information you want to keep with a particular project record. If you set up project optional fields for automatic insertion, they appear on this tab for new project records.

The entries from the project setup record will appear as defaults when you assign the project to a contract.

Project Tab

The Project tab of the Projects screen lets you choose default settings for the projects that you add to your contracts.