Project [Resource] List
For each type of resource you assign to a project, Project and Job Costing maintains a list of the resources you have added (for example, a Project Employee List, a Project Equipment List, and so on).
Similar to the Categories list, a project resource list lets you:
-
Open a separate screen to enter estimates for selected resources.
To display a list of project resources:
- On the tree, expand the folder for the desired project, then click the folder for the type of resource (such as Employees or Material). The program lists the particular resources you have assigned in the panel to the right.
- Alternatively, on the Project tab of the Contract Maintenance screen, select the project, click the Resources button, then click the resource you want to display.
To display the details for a particular resource, do one of the following:
- On the tree, expand the resource folder, then click the folder for the specific resource. The program displays the details for the selected resource in the right-hand panel.
- Alternatively, you can display the Project [Resource] List, as described above, select a specific resource on the list, then click the Detail button.