Changing I/C General Ledger Integration Options
You use the I/C G/L Integration screen to select options and settings that determine how your Inventory Control ledger interacts with your general ledger.
Important! Make sure that no one else is using the Inventory Control data and that no other Inventory Control screens are open for the company before you save changes to the G/L Integration screen. You cannot change I/C G/L integration settings if other Inventory Control screens are open, or if other users are working with the Inventory Control database.
- Print the G/L Integration report from the Setup Reports folder so you have a record of your G/L Integration settings before you start.
- If you want to change from using the Create G/L Batch screen to produce your general ledger transactions to creating them during day-end processing, be sure to run Create G/L Batch to process any outstanding transactions first, to avoid accidentally omitting transactions from your general ledger batches.
To change G/L integration options:
-
Inventory Control > I/C Setup > G/L Integration.
-
On the Integration tab, modify settings as needed. More...
Note: Any changes you make apply only to general ledger transactions created after the change, and do not affect existing general ledger batches.
-
To change the information that appears with G/L transactions, use the table on the Transactions tab. More...
- Select (highlight) the line for the information that you want to change, and then click Open, or double-click the line.
- On the G/L Integration Detail screen that appears, select information to add to or remove from the transaction field, and then click the Include or Exclude.
Note: You can assign one or more pieces of information (segments) to each G/L transaction field, provided that the combined length of the segments and separators does not exceed 60 characters. Fields exceeding this limit will be truncated when you post the general ledger transactions.
- Click Save to save the contents of the G/L transaction field.
- When you have finished, click Close to return to the Transaction tab.
- Click Save to save changes to the I/C G/L Integration screen.
Print the G/L Integration report from the Setup Reports folder to check that the settings were changed correctly.