Allocating Stored Material for AIA Reports
To allocate stored material used on a project:
-
Project and Job Costing > PJC Transactions > Material Allocation.
- Click the New button beside the Material Allocation Number field. (A new transaction number will be assigned when you add the transaction.)
- In the Status field, accept New, and then enter information in the other fields above the table.
- Click the Detail button.
The Detail Material Allocation screen appears.
- Enter details for this transaction. For each detail, click Add (or Save) to add or save the detail.
- When you have finished entering details, click Close to return to the Material Allocation screen.
- Click Add (or Save) to add or save the transaction.
- Click Post to post the transaction.
After posting a material allocation transaction
Print a transaction listing. For more information, see PJC Transaction Listing Report Screen.